REHUB Miami
1755 79th Street Causeway, FL 33141
Pre-ConstructionREHUB Miami
Pre-Construction1755 79th Street Causeway, FL 33141
Get updates when pricing, floor plans, and sales availability are released.
Continuum Club & Residences is a waterfront condo tower under construction at 1755 79th Street Causeway, also written as 1755 John F. Kennedy Causeway, in North Bay Village, FL 33141. Ian Bruce Eichner's Continuum Company is developing it in a 50-50 partnership with Erdal Aksoy's Aksoy Holding, with architecture by Arquitectonica, interiors by Durukan Design, landscape by Martha Schwartz Partners and KAST Construction as general contractor. It is Phase One of the developers' Continuum Waterfront District and the second Continuum-branded condo development in South Florida, after the two-tower Continuum on South Beach. Sales launched in December 2023 on a 32-story, 198-residence program. Reporting on the April 2026 construction financing describes an enlarged 36-story tower with 236 units. Residences come in four collections, Bay Lofts, Tower Residences, Sky Residences and Penthouses, with one- to four-bedroom layouts spanning about 800 to 4,000 square feet in launch-era materials and ceilings from 9 to 14 feet. Developer materials list private wraparound terraces, floor-to-ceiling impact-resistant glass, Sub-Zero and Wolf appliances, quartz countertops and marble-clad primary baths with Dornbracht fittings. The Continuum Club covers more than 60,000 square feet of amenities, including a full-floor indoor and outdoor level with the bay-facing Vista Pool and the south-facing Sun Pool, a 3,500-square-foot fitness center, a spa with cryotherapy and an infrared sauna, a golf simulator, business lounges, a kids' playroom and splash pad and a covered dog park. Along roughly 300 feet of waterfront are a restaurant and bar, the Island Walk promenade, a watersports launch dock and a planned marina, and residents arrive at a porte-cochere with 24/7 valet. Continuum paid $35 million for the 1.4-acre site in February 2023, broke ground in April 2025, and in April 2026 closed a $261 million construction loan from S3 Capital with about half the residences presold. Completion is targeted for July 2028. Phase Two next door, at 1819 and 1855 79th Street Causeway, is planned for about 300 more condos, Continuum's first hotel and a 20-slip marina, targeted for 2030. Join the waitlist on this page to receive pricing and floor plans as they are released.
Interested in Continuum Club & Residences?
Ask about available residences, current pricing, and purchase options.


1755 79th Street Causeway, FL 33141
| Apt# | Model | Bed / Baths | Floors | Interior + Ext (Sq Ft) |
|---|---|---|---|---|
| 01 | Residence 01 | 3 / 3.5 | 7 - 30 | 2,080 + 1,000 |
| 02 | Residence 02 | 2 / 2.5 | 7 - 30 | 1,524 + 281 |
| 03 | Residence 03 | 2 + Den / 2.5 | 7 - 30 | 1,600 + 272 |
| 04 | Residence 04 | 3 / 3.5 | 7 - 30 | 1,958 + 723 |
| 05 | Residence 05 | 2 / 2.5 | 7 - 30 | 1,370 + 616 |
| 06 | Residence 06 | 2 / 2.5 | 7 - 30 | 1,275 + 324 |
| 07 | Residence 07 | 1 + Den / 2 | 7 - 30 | 915 + 325 |
Floor plans and unit details are subject to change. Contact us for the most current information.
1755 79th Street Causeway, FL 33141
In-depth reporting on pricing, floor plans, and the surrounding market.